Maersk Installation

Maersk Gallant – Maersk Gallant Performance Report

Maersk Gallant – Maersk Drilling Three MudCubes installed in 2014 replacing four VSM300 shale shakers. Rig contractor: Maersk Drilling Operators: Statoil/ ConocoPhillips/ Total Norge E&P Rig type: Jack-up (Marine Structure Consultants CJ62-S120) Delivered: March 1993 Location: Norwegian Continental Shelf Running-hours per MudCube as of February 16, 2016 MudCube #1: 4411 hours MudCube #2: 5621 hours MudCube #3: 4612 hours Total running-hours all three MudCubes on Maersk …

CubilityMaersk Gallant – Maersk Gallant Performance Report
MudCube Scarabeo 5 after

Scarabeo 5 – Norwegian Continental Shelf Offshore Performance Report

Scarabeo 5 – Saipem  Four MudCubes installed in 2013 replacing five Derrick FLC-513 VE shale shakers. Rig type: Semi-sub (Maritime Engineering 4500 DP) Delivered: April 1990 Location: Norwegian Continental Shelf Running-hours per MudCube as of February 16, 2016 MudCube #1: 3050 hours MudCube #2: 3498 hours MudCube #3: 3568 hours MudCube #4: 3213 hours Total running-hours all four MudCubes on Scarabeo 5: 13329 hours Non-Productive Time (NPT) registered …

CubilityScarabeo 5 – Norwegian Continental Shelf Offshore Performance Report
Saudi Aramco 3

Middle East Land Performance Report

Case Study Location: Middle East Rig Type: Land Rig Number of MudCubes: 1 Overview SINO 7 is equipped with three Derrick Flo–Line shakers. The MudCube was installed downstream of these shakers and all returns were diverted to it when drilling the 6⅛” hole sections on two wells with a diesel based drilling fluid. Objectives The primary objectives for the installation of the …

CubilityMiddle East Land Performance Report
Installation

Maersk Resolve – MudCube in Operation

Maersk Resolve – Maersk Drilling Four MudCubes installed in 2014 replacing four MI Swaco BEM650 shale shakers. Rig contractor: Maersk Drilling Rig type: Jack-up (Marine Structure Consultants CJ50-X100MC) Delivered: January 2009 Operator: DONG Energy Field: Hejre Field Development, Denmark (HTHP) Running-hours per MudCube as of February 16, 2016 MudCube #1: 5758 hours MudCube #2: 5508 hours MudCube #3: 5234 hours MudCube #4: 4662 …

CubilityMaersk Resolve – MudCube in Operation
Maersk Giant - MudCube in operation

Maersk Giant – MudCube Performance Report

Three MudCubes were installed in 2012 replacing four MI Swaco BEM650 shale shakers. Case Study Location: North Sea / Norway Contractor: Maersk Rig Name: Maersk Giant Rig Type: Jackup Operators: Talisman / DONG / Det Norske Number of MudCubes: 3 Overview The Maersk Giant had been equipped with four BEM 650 shakers. In the 3rd quarter of 2012 the decision was made to replace these …

CubilityMaersk Giant – MudCube Performance Report
Shell Malaysia case study

Malaysia Offshore Performance Report

Case Study Location: Offshore Malaysia Contractor: Sapura Kenkana Drilling Rig Name: SKD Alliance Rig Type: Semi – Tender Number of MudCubes: 2 Overview Installed 2 MudCubes in parallel with 2 existing shale shakers, to run a trial over a 3 well drilling program on F-14 offshore in Malaysia. Objectives The primary objectives for the installation of the MudCubes were: Confirm that the …

CubilityMalaysia Offshore Performance Report
MudCube in Shale Technology Showcase

US Land Performance Report

Case Study Location: PA, USA Rig Type: Land Rig Number of MudCubes: 1 Overview The MudCube was installed on the rig downstream of the existing shakers (King Cobra x 2) to evaluate its performance on a 2 well drilling programme in the Marcellus basin. Objectives The primary objectives for the installation of the MudCubes were to determine its effectiveness to: Improve …

CubilityUS Land Performance Report